Corporate Atrium Kinetic Installation
A 9-floor corporate atrium that called for a visually calm yet mechanically expressive centrepiece.
Constraints
- — High airflow variability
- — Low maintenance requirement
- — Tight installation window
Process
The studio developed modular fabrication units with balanced moving elements and a carefully controlled distribution of mass.
The studio follows the same six steps on every commission: brief, site survey, design & engineering, fabrication, installation, service.
Outcome
Completed in 14 weeks, including installation, with documented quarterly servicing.