Corporate Atrium Kinetic Installation

A 9-floor corporate atrium that called for a visually calm yet mechanically expressive centrepiece.

Constraints

  • — High airflow variability
  • — Low maintenance requirement
  • — Tight installation window

Process

The studio developed modular fabrication units with balanced moving elements and a carefully controlled distribution of mass.

The studio follows the same six steps on every commission: brief, site survey, design & engineering, fabrication, installation, service.

Outcome

Completed in 14 weeks, including installation, with documented quarterly servicing.